Prototyping and Final Project
Prototyping and Final Project · Product Industrial Design (Blender & Digital Twin) course
Objectives
Section titled “Objectives”Close the loop from concept to something you can hold: prepare an STL, check fitment against a real board, test alongside firmware or the Twin, and deliver a Design Report.
Lessons
Section titled “Lessons”| # | Lesson | Content |
|---|---|---|
| 1 | Production files, fitment prototyping, and the Design Report | Checking the mesh and exporting STL, alternatives when you cannot print yet, checking fitment against a real board, testing alongside firmware, and writing a Design Report |
| 2 | Capstone lab: a prototype package and Design Report | Applying fixes from Module 5’s results, checking the mesh, exporting STL, printing or making a print plan, checking fitment, testing alongside firmware/Twin, and submitting the Design Report |
Approximate time per the original: about 3 hours (lessons) + a ~3-hour lab + separate time for printing/assembling the prototype.
Accompanying sheets and templates (in the resources/ folder of lesson 1):
Checkpoint
Section titled “Checkpoint”Before moving to the next module, check that you can do the following:
- A
.blend+.glb+ at least one STL file - A genuinely filled-in fitment table, or a print plan with measurement evidence
- A record of testing alongside firmware / the Twin / a web-app
- A Design Report covering every section, with ≥ 3 suggestions for the next round
TESA Open Knowledge · © 2026 สมาคมสมองกลฝังตัวไทย (TESA) · CC BY-NC 4.0
Content is licensed CC BY-NC 4.0. Reuse it non-commercially and credit the Thai Embedded Systems Association (TESA) every time. · How to cite TESA